Electrical insulation check of an assembly: how the agent finds the current path to the housing
The task
In the assembly, one part is live and must be electrically insulated from the steel housing. The assembly has 80-odd parts and fasteners: studs, bushings, gaskets, plates. Current can reach the housing through any steel contact or through an air gap that is too narrow.
Normally such places are looked for by eye in the drawings and the model. It takes a long time, and a mistake easily slips through. It then surfaces during installation, when a rework costs the most.
How it works
The agent takes the assembly model and for every pair of parts determines whether they touch or there is a gap between them. It recognises insulators by their material. Then all the steel is split into two sides: what is electrically connected to the live part, and what is connected to the housing.
Any connection between the sides without an insulator is an error. An air gap held only by geometry is flagged for review. The result is assembled into an interactive report: a summary, 3D with labels and a list of joints with what to do at each one.
What we found
The first check found two places where there was only air between the sides: 5 mm at a stud in a steel spacer and 2 mm at a beam wall. The design engineer revised the documentation with insulating bushings and a sheet, and the repeat check found no places without insulation.
The report now has 7 joints with an insulator in place and 3 places where the gap is held by the structure; the design engineer reviews those separately.
Where the AI ends and the human begins
- The agent does the routine. It goes through hundreds of pairs of parts, builds the graph, assembles the report and suggests where to place an insulator.
- The design engineer makes the decisions. Which insulator to use, whether a gap is acceptable, whether to change a part. The agent never edits the design documentation itself.
- The rules are written down and repeatable. What counts as a contact, what counts as an insulator, which gap is suspicious: these are check rules, not intuition. On every new revision of the model the check runs again in minutes.
This is how we build AI into any process: we find a step that people do by eye and from memory, describe it as rules, hand it to an agent and return the result to a person in a convenient form.
An important caveat: this is a check of the model's geometry, not electrical testing. We don't measure insulation resistance. We find places that definitely need to be fixed before production.
Who it's for
Anyone whose product has live parts: electric transport, power engineering, electrical and switchgear equipment. The same approach works for other checks that are now done by eye: assemblability, clearances, masses and centre of gravity.
Tell us which step in your process is done by eye and from memory. We'll show how to hand it to an agent without losing control.